Precautions for shower room

Feb 11, 2022

1. The pre-buried holes of the size of the shower room should be designed before the bathroom is decorated.

2. The best custom shower room with water supply system and tiles installed.

3. The wiring leakage protection switch device should be considered before the installation of the shower room to avoid rework.

4. The style of the bathroom depends on the layout of the bathroom, and the common ones are corner type and one-line type.

5. When installing the shower room, it should be installed in strict accordance with the assembly process.

6. The shower room must be firmly connected with the building structure and cannot be shaken.

7. The open shower room must be fixed with non-hollow wall with expansion bolts, and after draining, the water in the bottom basin should not exceed 500 grams.

8. The appearance of the shower room after installation should be clean and bright, the sliding door and the sliding door should be parallel or perpendicular to each other, left and right symmetrical, the sliding door should open and close smoothly, no gaps, no water seepage, and the shower room and the bottom basin should be sealed with silicone. 



You Might Also Like